Work planned for 2020

In the working season 2020, we plan to focus mainly on the monastery.

Four archaeologic test pits will be made in the monastery. Two of them will focus on uncovering of the monastery garden enclosure wall and they follow the wall restoration works from previous years. Archaeologic research will be followed by conservation and masonry work. The other two test pits will research the corners of the big quad on the monastery side and the entrance from monastery to the quad.

We will continue with the conservation and reconstruction of the southeast part of the standing monastery wing with the aim to conserve and statically stabilize the ruin. We will restore the fallen window arch and insert the hand-carved oak beams into the walls to extend and restore the original wooden-metallic stabilizing wall system.

In the church nave, we plan to place the crypt entrance cover and add a safety railing around it. Afterwards, the “big crypt” can be made accessible to tourists.